Location West Cameron, Louisiana
Client Callon Petroleum
Contract Amount $400,000

Project involved fabricating piling jigs and installation of one (6) pile well protector. One 48'x120' pile for helideck and one (8) pile platform for production equipment. All work was done on location in West Cameron Block 2 of the Gulf of Mexico. Cashman Equipment Corp. installed all piles and then installed pre-fabricated platforms into positions as well as installing two connecting bridges to join the structures.