Location Quonset Point, Rhode Island
Client Horizon Offshore
Contract Amount $2,200,000

The work associated with this project was part of the Northeast Gateway Project. Cashman Equipment Corp. was hired to transport 18” and 24” concrete coated pipe to Pier 2 in Quonset Point, Rhode Island and load the pipe in a sequence determined by Horizon Offshore onto ABS barges.