Location Boston, Massachusetts
Client Duke Energy Gas Transmission Line
Contract Amount $5,000,000

Cashman Equipment Corp. installed approximately 30 miles of 30” gas transmission pipe line offshore from Salem, Massachusetts to Weymouth, Massachusetts as a subcontractor to Stolt Offshore, Inc. Work performed by Cashman Equipment Corp. included loading pipe and materials on barges, underwater pipe pulling, dredging and backfilling.