Fore River – Marine Roll-On Roll-Off Facility
Location | Quincy, Massachusetts |
---|---|
Client | Massachusetts Water Resources Authority |
Contract Amount | $12,640,000 |
Work included two roll-on roll-off bridges that allowed trucks departing by barge to drive directly onto barges. The bulkhead was constructed of steel sheet piling with a concrete relieving platform built behind the bulkhead. This construction also included dredging and a large paved parking / staging area and access roads.